You are currently viewing How to Get a Temporary Power Supply Connection

How to Get a Temporary Power Supply Connection

If you’re working on a construction site or building a new property, you’ll likely need a temporary builder’s power supply in Newcastle to keep your tools and equipment running. In Newcastle, this is a common requirement, especially for builders and property developers.

This guide will walk you through the process of getting a temporary power supply and what to keep in mind.

A temporary builder power supply is a temporary electrical connection that provides power to construction sites. It’s used when there is no permanent power supply yet. The connection ensures your site has electricity to run tools, lighting, and other equipment during the building phase.

  • A power pole or a power box.
  • Wiring to connect to the electricity network.
  • Safety measures like circuit breakers and weatherproofing.

Why Do You Need a Temporary Power Supply?

Whether you’re building a home, an office, or any other structure, you’ll need power for:

  • Electric saws, drills, and other tools.
  • Lighting to work at night or in dark areas.
  • Charging devices like phones or radios.
  • Running heavy equipment like mixers or pumps.

Without temporary power, work could slow down or even stop, leading to delays and added costs.

Check Local Requirements

Before applying for a temporary power supply, check the regulations in Newcastle. You’ll need to follow rules from the local electricity distributor. This ensures the connection is safe and up to code.

Contact a Licensed Electrician

Hiring a licensed electrician is the first step. They will:

  • Inspect your site to determine the best location for the power connection.
  • Organise the installation of the power pole or power box.
  • Ensure the setup meets safety standards.

An electrician can also guide you on the permits required and submit applications for you.

Apply for the Connection

Once the electrician completes the site inspection, they will help you apply for a connection with your local electricity provider. This step involves:

  • Filling out forms for a temporary power supply.
  • Providing details like your address, project type, and power needs.

Your electrician may also deal directly with the electricity distributor, which makes the process easier for you.

Untitled design 31 - How to Get a Temporary Power Supply Connection
Elevated Electrical is your trusted local electrician in Newcastle. Our level 2 electricians are licensed to work on the Ausgrid network. Get a free quote.

After the application is approved, your electrician will install the setup. The process includes:

  • Installing a power pole or power box.
  • Connecting the setup to the electricity network.
  • Testing the connection for safety.

Depending on the site’s size and location, the setup might take a few days.

Before the power supply is turned on, an inspection is required. This ensures the connection meets safety standards. Once approved, your temporary power supply will be activated.

Once installed, it’s your responsibility to maintain the temporary power supply. Regular checks are important to ensure everything is working correctly. If you notice any issues, call your electrician immediately.

Temporary power supplies are meant to be used during the construction phase. Once the project is complete and the permanent power connection is ready, the temporary setup is removed.

Most connections are valid for 6-12 months, but this can vary based on your project and local regulations. Speak with your electrician or electricity provider for more details.

  • Plan Early: Don’t wait until the last minute to organise your temporary power. Start the process as soon as your project begins.
  • Choose a Reliable Electrician: Work with an experienced electrician in Newcastle who understands the local rules and processes.
  • Prioritise Safety: Ensure the setup includes safety features like circuit breakers and proper weatherproofing.
  • Monitor Usage: Keep track of your power usage to avoid overloading the system.

Common Questions About Temporary Power Supplies

How Much Does It Cost?

The cost depends on factors like the site location, the type of setup needed, and the electrician’s fees. On average, you can expect to pay between $1,000 and $3,000.

How Long Does Installation Take?

The installation process can take anywhere from 2 to 5 days, depending on the complexity of the site.

Can I Install It Myself?

No, you must hire a licensed electrician to ensure the setup is safe and complies with local regulations.

Why Choose Us for Your Temporary Power Supply in Newcastle?

At Elevated Electrical, we have years of experience helping builders and property developers set up temporary builders’ power supplies in Newcastle. Our licensed electricians handle everything, from site inspections to installation and maintenance.

Here’s why customers trust us:

  • Expert advice tailored to your project.
  • Quick and efficient installations.
  • Compliance with all safety standards.
  • Reliable service at competitive prices.

Power Up Your Project with Elevated Electrical!

Elevated Electrical provides efficient and safe temporary power supply setups for construction sites in Newcastle. 

Let our experienced team handle the process from start to finish. 

Call us now to power up your project!

Leave a Reply